This is a heavily interactive web application, and JavaScript is required. Simple HTML interfaces are possible, but that is not what this is.
Post
JRUrbaneNetwork
jrurbanenetwork.bsky.social
did:plc:ngej7s6zse445h665y5u57ki
Hong Kong has finalized the East Kowloon Line alignment and station placement. The E Kowloon Line is a mostly elevated APM/AGT line from Choi Hung 彩虹 to Yau Tong 油塘. HK is hoping to start construction in 2027 and opening by 2033. No word on cost of construction. A change...
2025-04-24T17:57:47.187Z