This is a heavily interactive web application, and JavaScript is required. Simple HTML interfaces are possible, but that is not what this is.
Post
numble.bsky.social
did:plc:a42jqwjlcksjan3aolgsyyo5
January 2025 presentation on Brightline West’s Rancho Cucamonga to Las Vegas high-speed rail project. 60 minute headways, total trip time of 2 hrs 10 min. Details of construction approach, station locations and trains provided.
https://construction-network.net/wp-content/uploads/2025/01/Brightline-West-Update-Construction-Network-1-29-25.pdf
2025-02-01T19:45:31.865Z